Contractors in Miami, Florida
Miami-Dade County • Population: 489,812
Showing 78 verified contractors
Quick answer
The City of Miami Building Department issues building permits, applied for through the iBuild portal. Miami sits in Florida's High-Velocity Hurricane Zone, so windows, doors and roofing need product approval for that zone, and you must record a Notice of Commencement before inspections.
The City of Miami has its own building department, its own tree ordinance and a historic preservation board. It also sits in the strictest wind zone in the Florida Building Code. These are the rules that will shape your project.
Who issues building permits
The City of Miami Building Department does. Its Guide to Getting a Permit says building permit applications go through the iBuild portal, with plans uploaded in ProjectDox. Depending on the work, you may also need permits from Resilience and Public Works, Planning or the Office of Zoning.
If you plan to do the work yourself, the city says "you will be required to complete and pass the Owner/Builder test," given in person at the Miami Riverside Center. If you hire, check the state license on the DBPR license search. Miami-Dade County also issues its own certificates of competency, and its contractor search shows a local contractor's status and any complaints. Our Florida licensing guide explains the state categories.
Hurricane-zone product approval
The Florida Building Code defines the High-Velocity Hurricane Zone in one line: "This zone consists of Broward and Miami-Dade counties." Two rules in that zone hit a homeowner directly. Every roofing component and system must have "a valid and current product approval" (Section 1512.2.1). Exterior walls, roofs, outside doors, skylights and glazing must meet impact test criteria or be protected by a device that does, such as a rated shutter (Section 1626.1). Miami-Dade's Product Control Search lets you look up approved products and filter by HVHZ classification, and the state's product approval search has an "Approved for use in HVHZ" filter. Ask your installer for the Notice of Acceptance (NOA) or state approval number for each product in the bid and check that it hasn't expired.
Notice of Commencement
Florida law has the owner record a Notice of Commencement before work begins on improvements over $2,500 (s. 713.13, s. 713.02(5), F.S.). Miami-Dade's NOC page adds practical rules:
- You, the owner, must sign it, not your agent.
- Record it with the Clerk of the Court and Comptroller before inspections, and keep a certified copy at the site.
- Record it within 90 days before work starts. If work doesn't start within 90 days, record a new one.
- File a separate notice for each permit.
Trees
Chapter 17 of the City Code regulates "the removal, relocation, pruning and trimming of trees," according to the city's tree information page. You need a permit to remove or relocate a covered tree unless an exemption applies, and a pruning permit to cut more than 25 percent of a canopy in one year. Ask your landscaper or roofer who pulls that permit before a branch comes down.
Historic properties
The city says it "requires a certificate of appropriateness (COA) for any work on historic properties" (Repair or Renovate a Historic Property). Repairs and minor alterations, like a roof replaced in the original materials, get staff review. New construction, major additions, demolition and larger alterations need a Special COA reviewed by the Historic and Environmental Preservation Board.
Flood zones
The Building Department's FEMA valuation policy says improvements costing 50 percent or more of the existing structure's market value are a Substantial Improvement and must meet FEMA rules, the city ordinance and the Florida Building Code. On an older house in a flood zone, ask your contractor to price the job against that line before you finalize scope.
Weather
NOAA's 1991-2020 normals for Miami International Airport show 67.41 inches of rain a year and about 91 days at 90ยฐF or hotter, with no normal freezing nights.
Find contractors in Miami
Compare Miami plumbers, electricians, AC contractors, Miami roofers, remodeling contractors, landscapers in Miami, painters, fence companies, concrete contractors and impact window and door installers. See window and door costs in Florida and roofing costs, use our hiring checklist, then get quotes.
Sources
- City of Miami: Building
- City of Miami: Guide to Getting a Permit
- City of Miami: Tree Information & Resources
- City of Miami: Repair or Renovate a Historic Property
- City of Miami: FEMA valuation policy (PDF)
- Miami-Dade County: Notice of Commencement
- Miami-Dade County: Product Control Search
- Miami-Dade County: Contractor Inquiry and Complaint Search
- Miami-Dade Clerk of the Court and Comptroller: Official Records
- Florida Building Code 2023, Chapter 2 definitions, Chapter 15 and Chapter 16 (UpCodes)
- Florida Building Commission: Product Approval search
- Florida Statutes s. 713.13 and s. 713.02
- NOAA NCEI 1991-2020 normals: Miami International Airport
- Florida DBPR license search
Frequently asked questions
Who issues building permits in the City of Miami?
The City of Miami Building Department. The city says building permit applications go through its iBuild portal, with drawings uploaded through ProjectDox. Some projects also need sign-off from Resilience and Public Works, Planning or Zoning.
Can I pull my own permit in Miami?
Yes, as an owner-builder, but the City of Miami says you must first complete and pass the Owner/Builder test, given in person at the Building Department in the Miami Riverside Center.
Do I need a permit to cut down a tree in Miami?
Usually. Chapter 17 of the City Code bars removing or relocating a covered tree without a permit unless the regulations exempt it, and pruning more than 25 percent of a canopy in a year needs a pruning permit.
What is an NOA and why does my window installer mention it?
A Notice of Acceptance is Miami-Dade County's approval for a building product. Miami-Dade and Broward make up Florida's High-Velocity Hurricane Zone, where the Florida Building Code requires current product approval for roofing and impact resistance (or rated shutters) for windows, doors and other openings. You can look up products in the county's Product Control Search.